I can't believe how long it has been since I put updated photos of the house on our blog, so here goes:
Exterior: Siding is still in progress, the areas down low without siding is where there will be engineered rock, we can't do it until spring. The gable ends there will be a shingle look siding, also may wait a little bit to complete that. The preprimed color is similar to what we will be painting it in the spring...
Interior: All of the electrical, plumbing, central vac, HVAC, are completed and now we are just wrapping up a few loose ends so we can start insulating this week.
Connors room looking down the house towards our room:
Connors closet with the bathroom and electrical in the background.
ELECTRICAL... aka lots of lights :-)
Laundry Room
Master shower and tub (areas without framing will be glass)
Stairs from the living room.
Master Bedroom
Fireplace.. obviously lots more to frame and do before it will look like it actually will, but it was a very exciting day when they got this beast in there, just the unit weighs about 600 lbs!
One of the two electrical panels in the house......
We have so much wire in our house!!!
Upstairs Jack and Jill bedrooms; this is from inside one bedroom looking at the bathroom that is between them, and the second adjoining room:
From inside the same room as above, just in a different direction, this is looking out into the upstairs playroom and down towards the stairs, notice the open to below area...
Still SOO much to do, but progress is definitely being made, when Sheetrock starts happening, things should really start to fly! We are getting SOO anxious to just be done building, and to be able to move in and start this next exciting chapter of our life! We are still shooting for end of May...we'll see if it happens!